Construction waste management : current status and challenges in sri lanka
By: Rameezdeen, Raufdeen.
Material type: TextPublisher: : , 2009Description: 80 p. ; ill. ; 30 cm.ISBN: 9789555167307.Subject(s): Environmental ProblemsDDC classification: 363.728Item type | Current location | Collection | Call number | Copy number | Status | Date due | Barcode | Item holds |
---|---|---|---|---|---|---|---|---|
Permanent Reference Materials | Main Library Ceylon Room | Sri Lanka Collection | 363.728 RAM (Browse shelf) | 1 | Not for loan | 193352 | ||
Scheduled Reference Materials | Main Library Scheduled Reference Division | Scheduled Reference Collection | 363.728 RAM (Browse shelf) | 2 | Available | 193353 |
Total holds: 0
Browsing Main Library Shelves , Shelving location: Scheduled Reference Division , Collection code: Scheduled Reference Collection Close shelf browser
No cover image available | No cover image available | |||||||
363.72095493 SRI Report on sanitation programme at Haldummulla | 363.728 EME Emerging and eco-friendly approaches for waste management | 363.728 LAN Waste disposal by landfill | 363.728 RAM Construction waste management | 363.7285 SRI ශ්රී ලංකාවේ පළාත් පාලන ආයතන මගින් බැහැර කරනු ලබන ඝන අපද්රව්ය පිළිබඳ දත්ත පද්ධතිය | 363.7289 WEE The H-Bomb to chernobyl, and after | 363.73 MOH Environmental pollution and management |
ISBN No - 978-955-51673-07
Comment by Mr Ananda Premalal Ranwake
01/04/2016It has been understood that the book of the object has been written as a project proposal of the COWAM project with collaboration of Galle Municipal Council. Although 8 years has elapsed from the beginning of the COWAM, the Construction and Demolition Waste recycling is still a dream in Sri Lankan context. The book has to be adopted much scientific data collection process since it has been addressed to the scientific community, but the failure, might be the reason COWAM has not given a pioneer position as a pilot project in SRi Lanka. Ranjan et al from the University of Moratuwa comments: "there is an only one plant established in the country for recycling Construction and Demolition Waste, named COWAM. COWAM plant is operating in the 14 days per month due to limited number of employees and limited quantity of C&D waste availability. Due to high cost of waste transportation, contractors are not willing to transport the generated waste to the plant. Due to the same reason Galle local authority which owns the plant is not willing to go sites and collect the waste”(page 106). Comments submitted by Ananda Ranawake Reference: Ranjan, G., Karunasena, H., Ratnayake, U., Construction and Demolition Waste Management Gaps in Construction Industry, 2014. FARU JOURNAL, Vol. 6, Issue 1, 104–108.